On 12 April 2007, the Navy canceled the contract with Lockheed Martin for the construction of LCS-3 after negotiations to control cost overruns failed.[6] The second General Dynamics ship (LCS-4) was also canceled on November 1, 2007[7] after similar cost overruns on their first ship. The Navy currently plans a brand new bidding process for the next three ships, with the winner building two ships and the loser only one.[8] Yeah, you're going to cost more, but we'll still reward you with a contract for a ship this seems insane to me.
man, they be creating all these weapons for war, when we should be creating weapons of love, baby. ya dig? howabout maybe we spend some dolla bills on gettin the hunnys new outfits that get all the fellas jive and randy, baby. ya dig? then, baby, maybe the fellas would be groovy with gettin down with some of them clitoral combat ships, know what im sayin'? sound gravy, baby?????
I know there is all kinds of mystical b.s. and unquantifiable in regard to this but, I want a quantifiable why. I want qualities and quantities before I risk seizure in the desert.
www.erowid.org Look up its positive and negative effects. Decide if it's for you. Personally, 'cid is fun as hell, it's my fave drug.